Road Closure Draughton Road, Maidwell from 6 March 2017
Road Closure Draughton Road, Maidwell 6 March 2017
We have been advised by Northamptonshire Highways that Mervyn Lambert Plant are requiring to install a new gas main connection outside the Old Bakehouse on Draughton Road in Maidwell. To undertake this work safely will require that the road is closed to through traffic for up to four days and is expected to commence on 6th March 2017.
A plan showing the closure and diversion route can be viewed here https://roadworks.org?tm=107388